Sök:

Sökresultat:

1936 Uppsatser om Railway construction - Sida 1 av 130

Långsiktigt spårväxelunderhåll - Förutsättningar och möjligheter

Due to their complexity and heavy wear from rail traffic, switches are a sensitive part of the railway infrastructure and moreover expensive to maintain. Furthermore, increasing railway traffic not only accelerates the wear rate but also obstructs the necessary maintenance measures. This paper examines the opportunities for a transition to a long-term maintenance strategy in the Swedish railway network. It contains a study of the maintenance strategy of Banverket, and also analyses statistics of errors in the railway infrastructure. The survey was completed utilising interviews with infrastructure managers, maintenance contractors, planners of railway operations and the Banverket material service department.

Stationsutveckling i stad och på landsbygd : exempel från Gagnef

The intention of this final thesis is to look into the improvement of small and run down railway stations. Many railway stations are today derelict and decaying. The purpose of this essay is to propose alternative strategies of action by discussing the ecology, the history and the social function of the railway station. There is also an overview of projects already completed. In the analysis part of the thesis, the genius loci or the spirit of place is put forward as means of reaching a solution.

Järnvägsstationer i Litauen 1861-2011 : Namngivare, namnbyten och språkbyten genom 150 år

The names of railway stations and halts along the earliest railway lines on Lithuanian territory have been studied, i.e. along those railway lines built between 1861 and 1873. Especially, attention has been drawn to names that are not obvious regarding the geographical location of the station or halt. Some 50 percent of the names are showing some kind of irregularity in this respect. Most common (about 30 examples) are stations or halts that are serving a population centre situated at some distance from the station, but still bearing the name of that population centre.

Värdering för markåtkomst vid järnvägs- och motorvägsbyggnation : en fallstudie av intrångsvärdering i området mellan Örebro och Arboga

The purpose of this work has been to investigate if there are any differences in the valuation process at infringements when highway and railway are built. The work has mainly been concentrated on the negotiation process in which The National Railway Department (Banverket) and The National Road Administration (Vägverket) try to get agreements with the land owners. The agreement includes compensation for infringement effects that affects the landowner?s property. The National Road Department uses the road law (Väglagen) when a highway shall be built.

En långsiktig järnvägslösning i Stockholmsregionen : En studie av vilka krav Trafikverket bör ta hänsyn till i sitt planeringsarbete

Travelling by train has increased during the last decades in Sweden. This has put pressure on the existing infrastructure and has created problems with delays and cancelled departures. The railway is a complex system with mutual dependencies and high vulnerability for disruptions. The situation for the railway system in the Stockholm region is today strained. The capacity is fully used.

Hastighetsbegränsningar i järnvägsanläggningen

En studie om hastighetsbegränsningar i banöverbyggnaden och kontakledningsystemet på Västkustbanan Helingborg - Lund..

Jämförelse av beräknad och verklig grundvattensänkning vid vägportar

Present master of science thesis has been carried out at the Swedish Road Administration consulting services (Vägverket Konsult) in Karlstad. The purpose of the study is to investigate how well the calculated drawdown of the groundwater table predicts the actual drawdown when the road and railway gates at the studied sites are built. For this purpose the groundwater levels at the three bridges were measured during 6 months. The bridges in question are two railway bridges situated in Ölme and Ulvåker and one road bridge crossing a pedestrian and cycling path in Lidköping.In Ölme the calculated area of influence was smaller than the measured one. It differed up to 30 meters, i.e.

Grundvattenpåverkan kring järnvägstunnlar i berg

Rock groundwater has always caused major problems when tunnelling. Water leaking into tunnels can cause large problems, not only on the construction itself but also on the environment. A continuous water leakage can lead to a declining water supply, and geotechnical problems can occur as subsidence in the ground. Therefore it is of great importance to predict the consequences that can appear in the surroundings due to a declining groundwater surface.The aim of the study was to investigate different methods for predicting leakage and changes in groundwater level due to tunnelling excavations in rock. This thesis was performed by comparing mathematical methods, actual groundwater changes and results from preliminary investigations.Investigations were made for three railway tunnels planned by Botniabanan AB.

Funktionsentreprenader inom Järnväg - möjligheter och hinder

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

Älmhults köping 1901 - 1970 : Från räls till IKEA

In the beginning of the 1860s, an important railway was built between Malmö and Stockholm. The railway became one of the most important projects that would influence the entire southern Sweden. The railway line was located to areas outside the ordinary routes and a number of communities were built up along its way.Älmhult was one of the communities that was built up due to the railway. In the beginning there were only a few farms and a station, but a community developed and the village grew. In 1901 the village became a small market town, which was an important event.

Gröna backar

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

Beslut om betydande miljöpåverkan för järnvägsprojekt : beslutsmotiveringar, åtgärder och regionala skillnader

This thesis examines the reasons to why railway projects conducted by Banverket (Swedish National Rail Administration) could be expected to cause significant effects on the environment, on which grounds the County Administrative Board and Swedish National Rail Administration base their decisions/assumptions and highlight regional differences between the different Swedish national rail administrations regions. Total 24 railway projects, conducted or being conducted, during the time period 2001 - January 2010 have been analyzed and studied. These projects represent eight different measures/activities which are dispersed throughout all five of the Swedish National Rail Administration´s different regions. Swedish legislations demands that the planner of a new railway project shall first conduct a pre-study and then conduct a public consultation which provides the participants an opportunity to provide input. The County Administrative Board shall then decide if the project could cause significant effects on the environment.

Kommunikationen av ett internationellt varumärke -En studie om IKEA

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

Belöningssystem inom den kommunala grundskolan - belöningssystem som motivationsfaktor och styrmedel

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

Handledning vid framtagande av handlingar för Generalentreprenad

This term project addresses how to develop construction drawings for a general contract. The project contains supervision, including blue prints as support as needed.Apart from directions on how to carry out the actual work, the supervision also discusses regulations governing all construction drawings. The supervision is created as guide for similar projects.The construction drawings is a complete construction guide, hence it includes all construction drawings. In addition, a room description and a general description is included..

1 Nästa sida ->